Grinding exposes pinholes, air pockets and small voids formed during concrete placement. Filling them creates a more uniform surface that polishes consistently, accepts densifiers and protective treatments more evenly, and traps less dirt.
Grout after grinding has exposed the defects but before densification and final polishing. Applying it too early can allow later grinding to expose new holes. Applying it too late can leave visible patches or residue in the finished floor.
Concrete Shield Grout 1000 is applied wet during the 120-grit grinding stage. Fine concrete dust combines with the liquid grout to produce a slurry that fills minor imperfections and blends with the surrounding concrete.
| Problem | Likely cause |
|---|---|
| Pinholes remain open | Too little slurry, blocked pores or inadequate working into the surface |
| White residue | Grout pooled or dried on the concrete |
| Fillings pull out | Contamination, weak concrete or insufficient adhesion inside the void |
| Visible patches | Heavy application or grouting too late in the polishing process |
Polishing grout is for pinholes, small air pockets, pop-outs and minor surface voids. Moving cracks, deep holes, broken edges and structurally unsound concrete require an appropriate repair system. Test the complete process on a representative area before treating the floor.