Home Store About Us Contact

How Many Coats Does an Epoxy Floor Need?

Most epoxy floors require two or three stages, depending on the product, concrete, traffic and finish. A coat may be a primer, build coat, colour coat or clear topcoat, so the complete system matters more than the number.

SystemTypical stages
Water-based epoxySelf-primer plus 1–2 finish coats
High-solids epoxyPrimer if required plus 2 epoxy coats
Decorative flakePrimer, flake base and clear topcoat
Metallic epoxyPrimer, metallic layer and clear topcoat

Water-Based Epoxy

AquaCoat™ requires 2–3 coats. On prepared concrete, the first coat can act as the primer and may be diluted where specified. Apply later coats undiluted for consistent colour and protection.

High-Solids Epoxy

Coat 823 HS is commonly installed as two high-build coats. Use 823 Prime or 820 Prime where separate priming is specified.

Flake and Metallic Floors

A flake system typically uses a primer or self-priming coloured base, broadcast flake and a compatible clear wear coat. Metallic systems use a prepared base followed by the decorative metallic epoxy layer and clear protection.

Choosing a Clear Topcoat

Coat 527 is recommended as a premium non-yellowing clear topcoat over compatible epoxy, flake and metallic systems. Where rapid curing and fast return to service are required, a compatible polyaspartic clear topcoat may be selected.

When Is Another Coat Needed?

Porous concrete, colour changes, uneven absorption or demanding traffic may require another coat. Extra coating cannot compensate for poor preparation. Follow the specified coverage, film thickness and recoat window for every layer.